Establish a baseline
Fit a baseline for a building in Savings Analysis: declare when it is occupied, apply a methodology card, fit it over a window and read the verdict it earns.
Being updated
Screenshots for this guide are being prepared. The steps below describe the product as it is today.
Before you start
- At least a few weeks of readings for the building.
Steps
Step 1: Declare when the building is occupied
On Variables & Factors, choose the building. Under Routine drivers, declare its operating calendar: the hours and days it is in use, in its own time zone, and why that drives its consumption.
Step 2: Choose a methodology card
In Savings Analysis, on the Analyse tab, choose the building. Each card is a ready-made method. A card the building cannot support is listed under Not for this building, with the reason.
Step 3: Apply it and set the window
Choose Use this — then adjust anything on a card. Radr fills in its settings; set the baseline window and change anything you need.
Step 4: Fit it and read the verdict
Choose Fit this configuration. The verdict says whether the model meets the standard it is judged against, gate by gate. To keep the run as evidence, give it a title and choose Save run.
What you’ll see
- A saved run is kept exactly as fitted, and appears under Saved.
- A verdict of not judged means Radr could not judge the fit, not that it failed.
Troubleshooting
- A card is under Not for this building.
- Open it to read why. Usually the building has not declared something the card needs, such as when it is occupied.
- The verdict says Not judged.
- The fit was measured, but there was too little data, or it was fitted at a finer grain than the standard applies to. It is not a pass and not a failure.
This guide is being updated and has not been verified against the current product.
Choose between Guided, Analyse and Saved
Savings Analysis has three tabs: Guided walks you through a before-and-after comparison, Analyse gives you every setting, and Saved keeps the runs you trust.
Savings and M&VChoose an IPMVP option
What IPMVP Options A, B, C and D mean for a project, how Radr decides which option a result may claim, and where to declare how your building is verified.
Savings and M&VLeave a bad period out of analysis
Check a building’s data quality in the Explorer, then leave a bad period out of analysis, such as an outage or commissioning, with the reason kept on record.
AdminStuck on a step?
Tell us which guide and which step, and we will help, then fix the guide.